New Tower Proposed in Miami-Clear Residences

Clear Residences New Construction Tower in Miami
Clear Residences New Construction Tower in Miami

Clear Residences, a 52-story tower proposal is now being examined by the Miami Planning and Development Department. Located at 130 SE 1st Street, the site itself sits on 0.55 acres or 23,750 square feet, with the current site now being used as parking.

The proposal with a letter of intent was submitted to the review board in December 2022 with Clear Residences featuring 545 residential units, 4,190 square feet of ground floor retail, and 199 parking spaces.

New Development in Miami-Clear Residences

The tower would rise 694 feet tall with Kobi Karp listed as the architect.

The developer is listed as Clear Communities Miami North Limited Partnership, and Bercow Radell Fernandez Larkin & Tapanes is their legal counsel during the approval procedure.

Joseph R. Colletti is listed as the officer for Clear Communities Miami North Limited. Clear Communities originally purchased the site in 2019 for $18 million while obtaining a mortgage for $10 million through the Pacific National Bank in Miami. The price equaled $756 per square foot.

According to the site’s T6-80-O zoning, an 80-story tower could be built there, requiring Federal Aviation Administration height approval.

New Tower Proposed in Miami Clear Residences
Clear Residences Miami

EDITION Residences Edgewater Construction Update

EDITION Residences Edgewater
EDITION Residences Edgewater

Construction is moving along for the 56-story EDITION Residences tower in Edgewater with its building permit application as well as a seawall permit application.

According to the permit application, the 56-story Edition will include a total of 187 residential units, a 13-level parking garage, and 3,500 square feet of business space. There will be 1,206,774 square feet of new building in total, with a hard construction cost of $215,750,000.

The builders announced last month that they anticipated commencing ground this Summer as a result of receiving $160 million in unit reservations.

One-bedroom-plus-den to four-bedroom floorplans with sizes ranging from 1,952 to 3,864 square feet and starting at $1.9 million will be available in immaculately finished homes. The tower will also have three lavish tri-level penthouses, each with a private rooftop pool and garden, representing the height of luxury.

The EDITION Residences, Miami Edgewater will have approximately 45,000 square feet of beautifully designed amenity spaces where owners can live, work, play, and entertain guests while exuding the same degree of luxury as the renowned hospitality brand. Two resort-style pools, a club bar, a library, private training studios, an extensive spa program, and six Guest Suites are just a few of the lauded features.

If you or someone you know have an interest in purchasing at EDITION Residences, please contact Lucas Lechuga via email at [email protected] or by phone at (786)247-6332.

New Renderings Released for Hilton Hotel Concept at Okan Tower

Okan Tower Hilton Hotel Concept
Okan Tower Hilton Hotel Concept

The projected Hilton Hotel inside the Okan Tower has just released new renderings.

Okan Tower recently underwent thorough piling tests, as required by the city’s building ordinance for extremely tall structures. The pile drilling phase has begun, and the developer declared, after all, the pilings passed their testing successfully. The foundation work’s contractor is named Jacob Companies Inc on permits issued by Miami’s Building Department. Ant Yapi Construction, a Turkish company with a Miami office, and Civic Construction, a Miami-based company, are the general contractors for Okan Tower.

Okan Tower, a mixed-use development with 70 stories and a tulip-shaped design that is destined to become a landmark in Downtown Miami, has revealed a new exterior rendering. The 902-foot towering megaplex, which was created by Okan Group and Behar Font & Partners, is situated at 555 North Miami Avenue at the intersection of Miami’s shoreline, with great dining, entertainment, and culture. A Hilton Hotel will be the development’s focal point, and there will be a variety of upscale facilities available in the homes.

When Okan Tower is finished, it will include more than 900,000 square feet of space, including a 64,000 square foot “Class A” office building, a 316-key Hilton Miami Bayfront Hotel, 163 Sky Residences with amenities solely for owners, 236 Short-Term Rental Residences powered by Hilton Hotels & Resorts, and 236 such residences. The development is slated to grow to be one of Miami’s tallest structures.

According to the architect’s website, the Okan Tower’s delicate profile was modeled after the tulip in honor of the company’s Turkish roots, where the tulip is the national flower.

Amenities:

  • 24-hour reception and concierge
  • 70th-floor rooftop pool and sky deck with private cabanas
  • 12th-floor lap pool with clubroom and lounges
  • State-of-the-art health and fitness center with yoga studio, Peloton bikes, and fitness MIRROR.
  • Sauna, steam, and treatment rooms
  • Children’s sensory and playroom
  • Theater
  • Wine cellar
  • Owner’s lounge

The completion date for Okan Tower is set to be in 2027. If you or someone you know have an interest in purchasing at Okan Tower, please contact Lucas Lechuga via email at [email protected] or by phone at (786)247-6332.

Hilton Hotel Okan Tower

Miami Riverbridge Project Receives Approval for Construction in Downtown Miami

Miami Riverbridge in Downtown Miami
Miami Riverbridge in Downtown Miami

On May 11, Miami commissioners voted overwhelmingly to accept the waivers required for the reconstruction of the Hyatt Regency in downtown Miami, Miami Riverbridge. This new supertall tower has also seen the release of new renderings.

Estimated to cost approximately $1.5 billion, the project calls for three new towers, two of 61 stories and one 95-story supertall, which would contain over 1,500 residential units, a new flagship 615-key Hyatt Regency hotel and 264 branded serviced apartments, 190,000 square feet of Class A meeting and events space, commercial and retail spaces, over 1,000 parking spaces and 50,000 square feet of open public space including a 480-foot-long rejuvenated riverwalk.

Arquitectonica is the architect of the Miami Riverbridge, which is being built by Hyatt Hotels Corporation and Gencom under the HRM Owner LLC.

The public benefits that the massive project would bring to the site and vicinity were underlined by Miami Riverbridge’s developers. Improvements to the streetscape for a better pedestrian experience and quicker access in and out of Miami’s urban core would relieve the congestion and traffic flow in this area of the city, which is frequently crowded and polluted by traffic.

The developers consented to give $25 million to help fund affordable housing in Miami. The project’s development would result in the creation of 4,500 jobs, with a rise in permanent employment from 350 to 900. Miami RiverBridge would bring in nearly $1.5 billion in city taxes, levies, and ground rent that could be used to expand public benefits throughout the city. Land leasing rent would rise from $250,000 to a minimum of $2,500,000, or 2.5% of gross receipts. A project park impact fee may also be used to pay for the renovation and reopening of the nearby Fort Dallas Park and the preservation of the nearby historic Flagler Worker’s House, which is located on city-owned property.

The convention center and the 40-year-old Hyatt Regency would be demolished to make room for the new complex if the proposal were to be accepted. By 2023’s end or the beginning of 2024, the developers hope to secure financing. The third tower is expected to be completed in Q3 2029, with the first two towers arriving by Q3 2028. Construction is anticipated to start in 2025.

Public Park at Miami Riverbridge
Miami Riverbridge River View

700 N. Miami Avenue Site at Miami Worldcenter Construction Update

700 N. Miami Avenue at Miami Worldcenter
700 N. Miami Avenue at Miami Worldcenter

New York-based developer, the Witkoff Group, is steadily working to change the Miami Arena’s former location. The thriving Miami Worldcenter’s premium real estate is getting ready to welcome three towers rising 57 stories tall.

Recently, Witkoff signed the utilities deal for the site at 700 N. Miami Avenue at Miami Worldcenter. The expected total for the connection fees for utilities and the Biscayne Basin Sanitary Sewer Special Connection fee is $2,085,466.50 and $1,265,004. Alex Witkoff signed the contract on behalf of the construction company, WG 700 North Miami LLC.

The signing of the utility deal and obtaining FAA height approvals for the towers are significant steps in the development process, even though Miami’s Building Department has yet to get construction licenses for the project.

On this large-scale undertaking, Monroe Capital, based in Chicago, is working with Witkoff Group. The location, which is within the confines of Northwest 8th Street, Northwest 1st Avenue, and North Miami Avenue, was previously slated to become the Marriott Marquis Miami Worldcenter Hotel & Expo Center, but is now in line for a dramatic overhaul. This includes the development of three imposing structures that could rise as high as 685 feet. Nichols Architects created the design.

The proposal promises a diverse mix of apartment buildings, shops, and dining establishments. With the utility agreement signed the 700 North Miami Avenue project is preparing for its vertical construction phase, marking an important step in the redevelopment of the former Miami Arena site.

This mixed-use project will undoubtedly become a landmark addition to Miami’s skyline due to its massive scale, prominent location, and reputation of its development and design team. It will also undoubtedly play a significant role in future developments at Miami Worldcenter.

New Renderings Revealed for Legacy Residences at Miami Worldcenter

Legacy Hotel & Residences at Miami Worldcenter
Legacy Hotel & Residences at Miami Worldcenter

Following the purchase of additional property for the Legacy Residences at Miami Worldcenter tower project, developers have recently released updated designs.

According to a letter from the developers, the recently purchased site offered a chance to increase the size of the medical office component.

The building’s remaining spaces are made up of a 218-room hotel, a condominium with 308 residences, and several levels of office space that will contain a top-notch medical institution.

Elevations included with the application show the spire rising to a height of about 60 feet at the tower’s summit. The Project has a comprehensive list of wellness amenities, as well as a number of swimming pools, hotel ballrooms, and a sky club.

On April 19, the Miami UDRB unanimously decided to advise in favor of approving the suggested design revisions. Prior to the enlargement, the project obtained approval in 2021, and vertical construction has already started.

Building Amenities:

  • Signature international restaurant
  • Full-service cafe with locally sourced baked goods
  • Grand ballroom and event spaces
  • Shul with a kosher kitchen
  • Largest hotel pool deck in Downtown Miami
  • Rooftop atrium with event space, full-service bar, an infinity-edge pool, and sundeck
  • International business lounge
  • Microluxe residences with a high-end, high-touch holistic lifestyle experience
  • Health and Wellness
    • 50,000-square-foot medical clinic with suites for health and performance
    • VIP health club with operating rooms and private VIP entrance
    • Diagnostic testing and imaging
    • Advanced performance testing center
    • Vitality spa

Residences Amenities:

  • Fully furnished residences
  • Floor-to-ceiling glass windows
  • Custom kitchen and bath cabinetry with stone finishes
  • Kitchen appliances by Bosch (or comparable)
  • Electrolux (or comparable) stackable washer and dryer

If you or someone you know have an interest in purchasing at Legacy Residences at Miami Worldcenter, please contact Lucas Lechuga via email at [email protected] or by phone at (786)247-6332.

Legacy Residences at Miami Worldcenter
Legacy Hotel & Residences

Oasis Hallandale Beach Breaks Ground

Oasis Hallandale Beach
Oasis Hallandale Beach

Oasis Hallandale Beach has officially broke ground on phase 3 of the new residential development.

There will be 1,448,000 square feet in the project.

The two skyscrapers will each have 25 floors and 500 luxury condominiums, according to the statement. The range of costs is $580,000 to $3.5 million.

Additionally, there will be dining establishments and office spaces, turning the area into a “live, work, play” attraction for locals and tourists.

The architect is Arquitectonica, and the developer is MGM Construction Group.

Building Features:

  • Valet parking
  • 24 hr. Lobby Attendant
  • Business and Conference Rooms
  • Lounge Bar with Pool Tables
  • Banquet Hall
  • Golf Simulator
  • Children’s Playroom
  • Indoor and Outdoor Movie Theaters
  • Fitness and Wellness Center
  • 2 Pools
  • Poolside Cabanas
  • Hot Tub Spa
  • Children’s Splash Pad
  • Playground
  • Barbecue and Fire Pit Areas
  • Yoga Lawn
  • Ping-Pong Room
  • Mini Soccer Field
  • Bike Parking
  • Electric Car Charging Station
  • Pet Park
  • Storage

Residence Features:

  • Floor to Ceiling Windows and Glass sliding doors
  • Broad Balconies with glass railing
  • Open Contemporary floor plans
  • 1-2 and 3+ Bedrooms
  • Powder room in selected Residences
  • Walk-in Closets
  • Imported Italian Cabinetry
  • Premium Italian Countertops
  • Stainless Steel Appliances
  • Imported Italian Tile in Kitchen and Bathrooms
  • Double sinks in master baths
  • Frameless glass-enclosed showers

The project’s interior designer, Domus Aurea Interiors, as well as Marcel Fernandez, president of MGM Construction Group, Maria Alejandra Fermin, vice president of MGM Construction Group, Steve Geller, commissioner for District 5 of Broward County, and others, were present at the groundbreaking ceremony on April 6.

According to a press statement, phase 1 is finished and phase 2 is almost finished. The project should be finished in full by 2026.

If you or someone you know have an interest in purchasing at the Oasis Hallandale Beach, please contact Lucas Lechuga via email at [email protected] or by phone at (786)247-6332.

Financing Secured for The Crosby Miami Worldcenter

The Crosby Miami Worldcenter Lobby

The vertical construction of The Crosby Miami Worldcenter, which is positioned to provide further density to the existing buildings at Miami Worldcenter, has been successfully funded with a sizeable $94.2 million by The Related Group and Merrimac Ventures. According to building permits submitted to the FAA in January, the residential tower is planned to rise 33 floors high and is anticipated to reach its peak at about 377 feet above ground, or 390 feet above sea level.

The loan was given to DT G Block LLC, a joint venture organization connected to the developers, by the Arkansas-based Bank OZK. The project’s interior design and architectural design are being handled by AVRO|KO and Cohen Freedman Encinosa & Associates.

The Crosby Miami Worldcenter, which commenced work earlier this year, is planned to have 3,370 square feet of ground-floor retail space and 450 completely furnished, ready-to-rent condos.

The Crosby’s construction should advance more quickly now that the finance is secured. It will stand out for its remarkable architectural design, which embodies contemporary luxury. The tower’s sleek design, which is accentuated by modern finishes, is made to blend perfectly with Miami’s dynamic cityscape.

The Crosby is cleverly constructed to take full advantage of its location, with the lower floors laying out a sizable retail area that is open to the public. The amenities offered by the skyscraper are designed to fit a contemporary urban lifestyle. The Crosby residences’ allowance for completely furnished units to be posted for short-term rentals on websites like Airbnb represents an important trend in the Miami condo market and is a standout feature of the development.

Beauchamp Construction serves as the general contractor and according to the current schedule, The Crosby is expected to be complete in the first quarter of 2025.

If you or someone you know have an interest in purchasing at The Crosby Miami Worldcenter, please contact Lucas Lechuga via email at [email protected] or by phone at (786)247-6332.

The Crosby Miami Worldcenter

Plans for New Residential Project in Miami Announced

New Construction Tower Announced in Miami
New Construction Tower Announced in Miami

In Miami’s Flagami neighborhood, south of Miami International Airport, a developer has plans for a brand-new residential development.

At 5645 Southwest Eighth St., The Richman Group and its affiliates have planned Parkview, a nine-story structure with 120 units, a rooftop pool and amenity deck, and parking for around 194 vehicles.

The proposal was recommended for approval along with a few recommendations by the city’s Urban Development Review Board.

According to Marissa A. Neufeld, an attorney for the developer, the land is divided into three parcels and is bordered to the north by an alley, to the west by an existing commercial complex, to the south by Southwest Eighth Street, and to the east by Southwest 56th Avenue.

Ms. Neufeld noted in a letter to the city that the project will contain a combination of parking for cars and bicycles and that the land is near several forms of public transportation and a major downtown thoroughfare, Southwest Eighth Street.

Behar Font & Partners are the project’s designers.

The property is a terrific location, and although it’s a smaller development it has some extremely fascinating elements, Behar & Font’s Javier Font told the board. According to him, the property features stunning views, including J. Fritz and Frances Gordon Park, which is directly south and across the street.

According to Mr. Font, the structure will have a smaller scale, a lot of glazing, and larger balconies, giving it a more horizontally linear appearance. A fully functional gym, a clubroom, a lobby, and coworking spaces will be available on the ground floor. The pool deck and some residential units are on the ninth story.