Rilea Group Launches Campaign to Crowdfund Mohawk at Wynwood Project

Rilea Group plans to develop Mohawk at Wynwood
Mohawk at Wynwood

Miami-based developer, Rilea Group has launched a campaign to crowdfund a mixed-use project, called Mohawk at Wynwood, through an investor community known as RealtyMogul. This platform is comprised of 200,000 investors with a $2.8 billion portfolio that backs over 15,000 multi-family units.

The campaign was launched on April 5, 2021 and is expected to end June 4, 2021. The goal for Rilea Group is to raise $10 million through RealtyMogul with an overall price tag of $103.4 million.

Mohawk’s design brings the edginess of local artist’s murals and modern steel framing to create a master piece that targets young entrepreneurs.

Building Features:

  • 12-story building
  • 225 residences
  • 3,500 square feet of office space (for residents only)
  • 22,000 square feet of retail space
  • Designed by Deforma Studios
  • 1, 2, and 3 bedroom unit options

Building Amenities:

  • Rooftop pool
  • Bar
  • Lounge
  • Chef’s dining room
  • Children’s room
  • Game room
  • 2-story gym
  • Yoga room
  • Dog park
  • Outdoor greenway

Rilea group is currently under contract with 29th Street Warehouses LLC for the Mohawk lot located at 56 N.E. 29th Street on a 1.5 acre property.

Modera Biscayne Bay Tower Tops Off – Preleasing Begins May 2021

Modera Biscayne Bay Tower
Modera Biscayne Bay Tower Tops Off

Modera Biscayne Bay recently toped off on the 28-story tower located at 2150 N Bayshore Drive in Edgewater. This luxury mixed-use residential tower features 296 apartments for rent, 11,000 square feet of retail space, and an 8-story parking garage with 425 spaces. This tower was originally occupied by Unity on the Bay Church before demolition.

Building Information:

Modera Biscayne Bay Tower View from Biscayne Bay

Building Amenities:

  • 27th-floor amenity deck
  • Rooftop pool
  • Barbecue area
  • Club-quality fitness studio
  • Yoga and Pilates studio
  • Clubhouse
  • Internet/business lounge
  • Conference room
  • Coffee Bar
  • Pet Spa
  • Catering kitchen for entertainment
Modera Biscayne Bay Aerial View

Leases Include:

  • Digital package lockers
  • Additional storage areas
  • Bike storage
  • 8 stories of structured parking
Modera Biscayne Bay Preleasing in May 2021

Resident Amenities:

  • 1, 2, and 3 bedroom apartments (den and penthouse options available)
  • Energy Star® stainless steel appliances
  • Quartz countertops
  • Tile flooring
  • Upgraded fixtures
  • Tile backsplashes
  • In-home washers and dryers
  • Walk-in closets
  • Programmable thermostats
  • Private patios or balconies
  • Select units feature:
    • 15-foot ceilings
    • Breakfast bars
    • Double vanities
    • Linen closets
    • Built-in storage/shelving.

As construction continues with the last phase, Modera Biscayne Bay will begin pre-leasing in May 2021.

Modera Biscayne Bay Garage View

City of Miami Approves New 37-Story Tower Called The District

The District in downtown Miami
Rendering for the new 37-tower called The District.

The City of Miami has recently approved The Related Group and Parcel C LLC’s proposal for a 37-story residential tower in downtown Miami, named ‘The District.’ This project will include 343 residential condos, 2,297 square feet of retail space, and will have no parking (the developer is requesting a waiver to allow off-site parking). Siegar Suarez Architects prepared the design and plans.

The District is proposed to be 393 plus feet tall and will be located at 225 and 223 N. Miami Avenue. According to Miami Today, The District will have retail on the ground floor, and the apartments will be located above the retail space. The paperwork that was filed also includes the fact that some units may be transitioned into hotel rooms as well.

Amenities for The District include a gym, racquetball, basketball, lounges, pool deck, rooftop spa, and barbeque area.

Several waivers have been requested and approved for the Miami 21 zoning code:

  • Primary and secondary setbacks
  • Side and rear setbacks above the eighth story
  • Permit off-site parking within 1,000 feet
  • 10% increase in the maximum lot coverage
  • Two residential loading berths substituted for one commercial loading berth
  • Reduction of the required ground-level setback on the property’s frontage

According to the Board member Robert Behar, who shared concerns about pedestrian safety with the limited amount of parking available.

According to The Related Group’s Attorney, Ms. Escarra, has stated, “The Project limits the interaction between vehicles and pedestrians by removing vehicular access to the Property. This will allow pedestrians to enter the Project with no vehicular conflict, as parking will be provided offsite, per the requested Waiver.”

The city’s Urban Development Review Board voted unanimously to recommend approval of the project on April 9, 2021. The construction permit has not been filed yet, and the groundbreaking is set to begin sometime this year.

Dezer Development Launches Bentley Residences

Dezer Development announces Bentley-branded luxury tower, Bentley Residences.

Miami welcomes the first-ever Bentley-branded luxury residential tower. The news was announced today that this remarkable tower will stand tall along with other luxury car brands like the Porsche Design Tower and Aston Martin Residences. This remarkable project will have a sophisticated and sleek design standing at 749 feet tall in Sunny Isles Beach. This tower will be the tallest beachfront tower in the U.S. and its height already has FAA approval.

Dezer Development and Sieger Suarez Architects will be partnering to create a luxurious design worthy of the Bentley brand. Dezer and Sieger Suarez has previously worked on Armani and Porsche towers. Gil Dezer, President of Dezer Development states, “Partnering with Bentley Motors, a true global luxury brand and being able to create another first in the Miami marketplace is an extraordinary opportunity.”

According to the press release, there will be 200+ residences, each with a multi-car garage with a car elevator delivering your car straight to your residence (similar to that of Porsche Design Tower). Each unit will also feature its own private balcony, pool and sauna. Floor-to-ceiling windows throughout the residences with ocean and bay views.

Building amenities will include a gym, pool, spa, restaurant (TBD), lounge, cabanas, cinema, whiskey bar, and garden. According to Forbes, Bentley Residences will be built according to the the Florida Green Building Council Certifications with anticipations that the building will use less energy.

The ground breaking is expected to begin in 2023 and construction is expected to be complete by 2026. We will update this article as more information is published about Bentley Residences.

Construction is Underway for Platform 3750 Project in West Grove Neighborhood Miami

Rendering of Platform 3750 by Kobi Karp Architecture

Platform 3750, a mixed-use project in the West Grove neighborhood of Miami has just broke ground at 3750 South Dixie Highway on 2.1 acres. This site is within walking distance of the Douglas Road Metrorail Station. The Cornerstone Group is the lead developer for this mixed-use project and is currently leasing from Miami-Dade County after winning a request for the RFP process.

This project is expected to create 300 jobs and is designed to ‘jumpstart economic activity’ in West Grove. It is anticipated to have 191 apartments, 21,000 square feet of retail space already leased to Aldi and Starbucks, 14,000 square feet of office space for the Cornerstone Group, 12,500 square feet of office space for the county’s Community Action & Human Services division, 3,000 square feet for the district office of county Commissioner Raquel Regalado, and 400 parking spaces.

Cornerstone Partner, Lenny Wolfe states, “West Grove has been neglected for a while. There was a very small amount of affordable housing built there and there is tremendous need. And it’s a food desert because there’s a real need for an affordable grocery store.”

This project was designed by Kobi Karp Architecture and the general contractor is Current Builders

The loan for this project includes a $60.5 million loan, $8 million county’s surtax, $3.5 million city government obligation bond, $1.95 million city Home loan, $1.4 million from the county economic development fund, and $5 million in tax credit equity.

Cornerstone Partners announced that they anticipate this project to be completed by the end of 2022.

Missoni Baia Construction Passes its Halfway Point

Welcome to Missoni Baia! This remarkable waterfront tower will feature 57 floors with an impressive 200 feet of Biscayne Bay frontage. Curated by New York designer Paris Forino, with 249 custom one-to-five bedroom options. The architect for this tower is Hani Rashid of Asymptotoe Architecture and the developer is OKO Group under Vladislav Doronin.

Updated Missoni Baia Construction Picture

Construction is underway for this gorgeous tower and it has passed the half-way point. According to CEO of developer Cain International, “This milestone is a testament to the team’s diligence and hard work despite the challenges presented by the current environment. Building Missoni Baia to its midpoint milestone is a remarkable moment for our team as we bring this elegantly designed, landmark project to life.”

According to a press release from Missoni Baia, all windows have been added to the north and south tower up to the 36th floor, including partial balconies. Civic Construction, the general contractor has stated that top-off is estimated this time next year.

Building Information:

  • Prices start at $600,000 to $9 million
  • One-to-five bedroom layouts
  • 776 to 3,788 square feet
  • Direct Bay or City views with panoramic views of Biscayne Bay, Downtown Miami or South Beach
  • Residences feature 10 foot ceilings
  • Terraces with impact resistant glass windows are 8 to 10 feet deep
  • Marble-encased bathrooms with European styles lacquered cabinets
  • Custom kitchens with top-of-the-line cabinetry and high end appliances

The residents will have access to all the amenities a luxury resort has to office; five separate pools with an Olympic-sized swimming pool, and an infinity pool with views of Biscayne Bay. Poolside lounges, cabanas, elevated tennis courts, and luxury spa are also available. Residents will also receive membership access to the Grand Bay Club beachfront of Miami’s Key Biscayne.

Updated Construction Photo of Missoni Baia

Missoni Baia is still on track for completion for the end of 2022! Subscribe for more updates on Missoni Baia construction!

Tallest Residential Tower in Miami at 100 Stories – Waldorf Astoria Residences Miami has Officially Launched Sales

Rendering of the 100-story Waldorf Astoria Residences Miami

Waldorf Astoria Residences Miami has officially launched their sales center on March 23rd, 2021. Located at 300 Biscayne Boulevard, Waldorf Astoria is planned to be the tallest residential tower in Miami at 100 stories and will be the tallest tower south of Manhattan.

This tower will feature 360 condo, 205 hotel rooms, and suites. Amenities include a Peacock Alley Lounge, a restaurant, indoor and outdoor event area, resort-style pool with cabanas, spa and fitness center.

Architects include Carlos Ott and Sieger Suarez, whom have created a nine offset glass cube design for the tower. The hotel is announced to be within the first 3 cubes of the tower and the rest will include the condominiums.

Developer Information:

  • Developers: PMG – Property Markets Group & Greybrook Realty Partners
  • Interior design firm: BAMO – www.bamo.com
  • Architect: Carlos Ott (conceptual artist) with Sieger Suarez

Tower Distribution:

  • 3rd Level –  Condominium lobby
  • 5th level – Hotel Signature Restaurant and Peacock Alley
  • Level 7 to 16 – Hotel guest rooms and suites
  • Level 17 – Hotel function spaces, main ballroom, junior ballrooms and multi-purpose function space 
  • Level 19 – Hotel lounge bar, meeting and boardrooms 
  • Level 21 – Hotel pool deck with café and signature F&B 
  • Level 23 and 24 – Spa and fitness
  • Level 26 to 31 – Hotel guest rooms and suites
  • Level 31 to 32 – Private residential amenity level; pool deck
  • Level 34 to 85 – Residential condominium
  • Level 86 to the top – Penthouse level

Pricing:

  • Junior Suite Residences $650,000
  • 1 Bedroom Residences $1,000,000
  • 2 Bedroom Residences $1,700,000
  • 3 Bedroom residences $3,100,000
  • 4 Bedroom Residences $4,900,000

Payment Plan:

  • 10% deposit at contract
  • 10% deposit in 6 months
  • 10% deposit groundbreaking
  • 10% deposit one year after the groundbreaking
  • 60% deposit at closing
  • HOA – $0.80 per square feet
  • Rental terms – minimum 3 months only twice a year

Building Overview:

  • 100 Stories
  • 360 private residences
  • Studios, 1, 2, 3, and 4-bedrooms
  • Penthouse Collection

Building Features:

  • The 100-story tower located in Downtown Miami across from Biscayne Bay
  • Conceptually designed by world-renowned architect Carlos Ott in collaboration with Sieger Suarez Architects
  • 360 branded luxury residences
  • 205 hotel guestrooms and suites
  • Interiors created by BAMO design firm
  • Peacock Alley
  • True Waldorf Service and concierge
  • Unobstructed views of city and downtown skyline, Miami Beach and Atlantic Ocean
  • Waldorf Astoria immersive resort-style pool with outdoor café and private cabanas
  • Private Bar/ Wine Tasting Room
  • Signature Restaurant
  • All-Day Dining Brasserie
  • Pre-function and function spaces
  • Meeting and boardrooms
  • Waldorf Astoria Kids Clubs
  • 24 hour Valet services

Sales have started and the construction completion date is set for 2025. If you or someone you know has any interest in purchasing a unit at Waldorf Astoria Residences, please contact Lucas Lechuga via email at [email protected] or by phone at 786-247-6332 for more information.

Vizcaya Metrorail Station Project Begins Reviewing 7 Construction Proposals

Vizcaya Metrorail Station Project

Miami-Dade County is currently reviewing 7 construction proposals for the mixed-use project at the Vizcaya Metrorail Station. This development on 2.62 acres is set to feature condominiums, retail shops, and restaurants.

According to the South Florida Business Journal, all proposals are limited to 10 stories as well as a majority of the project must be residential units with 12.5% to be workforce housing.

Miami-Dade requested proposals in December 2020. The deadline was at the beginning of March and the current 7 proposals include those from:

  • Related Group: Proposing two 25-story towers. The first tower would have 391 apartments and 2,500 square feet of retail space. The second tower would be 320,000 square feet of office space. A 7-story parking garage with 638 spaces would be included. This project is above the 10-story maximum height restrictions.
  • Rilea Group, Axis Realty Trust, Coastal Construction and McKinney Properties: This project would be called ‘Vizcaya Park’ with two 10-story buildings connecting by a bridge. Proposal includes 288 apartments, 19,040 square feet of retail, 135 public parking spaces in underground garage, and 223 parking spaces for residences.
  • Adler Group & 13th Floor: This proposal includes 327 apartments with one 9 and one 10-story buildings. Improvements include those to the Underline, Metrorail station and the pedestrian bridge. This would include 309 parking spaces, with 100 for the public.
  • Grass River Property and Coral Rock Development Group: This project will include 292 workforce or affordable housing units and 3,000 square feet of retail in two eight-story buildings. Project includes 310-space parking garage and a community center.
  • Housing Trust Group: This proposal includes 209 workforce housing units, 15,000 square feet of offices, 2,600 square feet of retail, and a 126,000-square-foot parking garage in eight stories.
  • Mill Creek Residential: This proposal includes 392 apartments in two 10-story buildings with 8,000 square feet of retail and 620 parking spaces.
  • Terra Development Group: One 5-story and one 10-story with a combined 327 workforce housing units, 8,530 square feet of commercial space. Also included are 463 parking spaces with 100 for public use.

The proposals were set to be reviewed on March 19, 2021 but as of right now, no determination has been made on which proposal won.

First Treehouse Hotel will Open in Miami’s Brickell District in 2025

Rendering of Treehouse Hotel in Brickell. Photo Credit: BizJournals/SouthFlorida

The Treehouse Brickell Hotel will be the first United States location as part of the SH Hotels & Resorts expansion. This 191-room, 62-floor, mixed-use hotel will be located at 1 Southside Park in the Brickell neighborhood.

According to the South Florida Business Journal, SH Hotels & Resorts is a subsidiary of Miami Beach-based Starwood Capital Group, led by Chairman and CEO Barry Sternlicht. SH Hotels & Resorts also operated the 1 Hotels brand, including 1 Hotel South Beach. There is currently one other Treehouse Hotel, located in London.

In a statement from SFBJ, Sternlicht said, “Brickell is the perfect place for a Treehouse. Like its London counterpart, Treehouse Brickell will be as much a destination for travelers as a local hangout, and will introduce a new kind of thoughtful, fun and imaginative hospitality experience to the area.”

This new hotel will be part of the 1 Southside development at 105-1133 S.W. Second Avenue, in Miami totaling 2.5 million square feet and rise 62 stories. This development will also include 1,175 apartments, 190,000 square feet of office space, and 11,000 square feet of restaurants.

  • Developer: JDS Development Group
  • Architects: SHoP Architects and ODP Architecture and Design
  • Landscaping Designer: James Corner Field Operations
  • Interior Designer: New York-based Rockwell Group

Michael Stern, founder and CEO of JDS Development Group states that “Barry continually raises the bar for exceptional experiences in hospitality, and our location at 1 Southside Park will provide the perfect environment to welcome Treehouse to Brickell … and celebrate the hotel’s first U.S. location.” Construction has begun and is expected to be completed by 2025.